Odense low-floor articulated tram 03 "Forbindelsen"
OperationalThe history of the tram
Odense Letbane
Operational
March 2020: Delivered as Odense low-floor articulated tram 03 "Forbindelsen", manufacturer Stadlerrail Werk Pankow, series 01-16, width 2.65 m, length 42.00 m, manufactured 2020.
![Odense low-floor articulated tram 03 "Forbindelsen" at Kontrol centret (2020)](/foto/l/odense-low-floor-articulated-tram-03-forbindelsen-at-kontrol-centret-2020.webp)
March 12, 2020.
![Odense Tramway with low-floor articulated tram 03 "Forbindelsen" at Vesterbro (2022)](/foto/l/odense-tramway-with-low-floor-articulated-tram-03-forbindelsen-at-vesterbro-2022.webp)
July 15, 2022.
![Odense Tramway with low-floor articulated tram 03 "Forbindelsen" at Palnatokesvej (2022)](/foto/l/odense-tramway-with-low-floor-articulated-tram-03-forbindelsen-at-palnatokesvej-2022.webp)
December 10, 2022.
![Odense Tramway with low-floor articulated tram 03 "Forbindelsen" at Hestehaven (2023)](/foto/l/odense-tramway-with-low-floor-articulated-tram-03-forbindelsen-at-hestehaven-2023.webp)
April 6, 2023.
![Odense Tramway with low-floor articulated tram 03 "Forbindelsen" at Rosengårdcentret (2023)](/foto/l/odense-tramway-with-low-floor-articulated-tram-03-forbindelsen-at-rosengaardcentret-2023.webp)
April 14, 2023.
![Odense Tramway with low-floor articulated tram 03 "Forbindelsen" at Idrætsparken (2023)](/foto/l/odense-tramway-with-low-floor-articulated-tram-03-forbindelsen-at-idraetsparken-2023.webp)
May 13, 2023.
![Odense Tramway with low-floor articulated tram 03 "Forbindelsen" at Central Station (2024)](/foto/l/odense-tramway-with-low-floor-articulated-tram-03-forbindelsen-at-central-station-2024.webp)
February 19, 2024.
![Odense Tramway with low-floor articulated tram 03 "Forbindelsen" at Bilka (2024)](/foto/l/odense-tramway-with-low-floor-articulated-tram-03-forbindelsen-at-bilka-2024.webp)
Odense Tramway with low-floor articulated tram 03 "Forbindelsen" at Bilka (2024)By Henrik Boye.
April 27, 2024.