Berlin articulated tram 219 539-8
OperationalThe history of the tram
Berliner Verkehrsbetriebe (BVG)
Operational
1987: Delivered as Berlin articulated tram 219 539-8, manufacturer Tatra, type KT4D, length 18.20 m, weight 22.0 t, power output 160 kW.
Verkehrsbetrieb Potsdam (ViP)
Operational
1989: Taken over by the company as Potsdam articulated tram 076 (ex Berlin articulated tram 219 539-8), manufacturer Tatra, type KT4Dm.
Verkehrsbetrieb Potsdam (ViP)
Operational
1995: Rebuilt to Potsdam articulated tram 154 (ex Berlin articulated tram 219 539-8), manufacturer Tatra, type KT4Dm.
Drawing: Potsdam articulated tram 154 by S Hauptbahnhof (2018)By Henrik Boye.
December 24, 2018.
December 24, 2018.
Tram Potsdam | Tram | VIP | March 2020By Rail Public Transport.
March 14, 2020.
March 14, 2020.