TRAM TRAVELS

Phoenix Valley Metro Rail: 19th Avenue / Dunlap station - Gilbert Road / Main Street station

Operational

City: Phoenix (United States).
Route length: 49.9 km (31 miles).
Driving time: 38 min.

Track gauge: 1435 mm (standard gauge).
Opened: December 27, 2008.

The line is operated by

Valley Metro
Operational

Tram lines in Phoenix

Phoenix Valley Metro Rail: 19th Avenue / Dunlap station - Gilbert Road / Main Street station
Operational

Phoenix tram line 1 Brill Line
Closed

Phoenix tram line 2 Capitol/W. Adams-East Lake Park
Closed

Phoenix tram line 3 Kenilworth
Closed

Phoenix tram line 4 Indian School
Closed

Phoenix Valley Metro Rail: 19th Avenue / Dunlap station - Gilbert Road / Main Street station stops

19th Avenue / Dunlap station, Gilbert Road / Main Street station, and Washington / Central Ave.


Phoenix Valley Metro Rail: 19th Avenue / Dunlap station - Gilbert Road / Main Street station route map

View the route map in high resolution.

Photos and videos of Phoenix Valley Metro Rail: 19th Avenue / Dunlap station - Gilbert Road / Main Street station

Phoenix Valley Metro Rail with low-floor articulated tram 106 at Washington/Central Ave (2021)Phoenix Valley Metro Rail with low-floor articulated tram 106 at Washington/Central Ave (2021)By Silas Boye Nissen.
December 30, 2021.

Add a comment

Last updated: March 13, 2024.