TRAM TRAVELS
5

Chemnitz tram line 5: Hutholz - Gablenz

Operational

City: Chemnitz (Germany).
Route length: 13.2 km (8.2 miles).
Driving time: 27 min.

Track gauge: 1435 mm (standard gauge).

The line is operated by

Chemnitzer Verkehr (CVAG)
Operational

Lines in Chemnitz

Select line type: Tram lines, extra lines, museum lines, and regional lines.


Tram lines in Chemnitz

1Chemnitz tram line 1: Zentralhaltestelle - Chemnitz Schönau
Operational

2Chemnitz tram line 2: Zentralhaltestelle - Bernsdorf
Operational

3Chemnitz tram line 3: Hauptbahnhof - Technopark
Operational

4Chemnitz tram line 4: Hutholz - Hauptbahnhof
Operational

5Chemnitz tram line 5: Hutholz - Gablenz
Operational

3Chemnitz tram line 3: Zentralhaltestelle - Rottluff
Closed

8Chemnitz tram line 8: Wladimir-Sagorski-Str. - Schönau / Popowstr.
Closed

10Chemnitz tram line 10: Hauptbahnhof - West- / Kochstr.
Closed

Chemnitz tram line 1
Closed

Chemnitz tram line 2
Closed

Chemnitz tram line 4
Closed

Chemnitz tram line 5
Closed

Chemnitz tram line 6
Closed

Chemnitz tram line 7
Closed

Chemnitz tram line 8
Closed

Chemnitz tram line 9
Closed

Chemnitz tram line 12
Closed

Chemnitz tram line 16
Closed

Chemnitz tram line 21
Closed

Chemnitz tram line 51
Closed

Chemnitz tram line 5: Hutholz - Gablenz stops

Hutholz, Gablenz, and Eins Energie In Sachsen.


Chemnitz tram line 5: Hutholz - Gablenz route map

View the route map in high resolution.

Photos and videos of Chemnitz tram line 5: Hutholz - Gablenz

Straßenbahn Chemnitz / Tramvajový provoz ve městě ChemnitzStraßenbahn Chemnitz / Tramvajový provoz ve městě ChemnitzBy tom88CZ.
May 15, 2012.
Straßenbahn Chemnitz - Impressionen Dezember 2012Straßenbahn Chemnitz - Impressionen Dezember 2012By 777whitestone.
2012.
Chemnitz tram line 5 with low-floor articulated tram 611 at Zentralhaltestelle (2008)Chemnitz tram line 5 with low-floor articulated tram 611 at Zentralhaltestelle (2008)By Henrik Boye.
July 3, 2008.
Chemnitz tram line 5 with low-floor articulated tram 904 at Gablenz (2008)Chemnitz tram line 5 with low-floor articulated tram 904 at Gablenz (2008)By Henrik Boye.
July 3, 2008.
Chemnitz tram line 5 with railcar 521 at Eins Energie In Sachsen (Stadtwerke) (2008)Chemnitz tram line 5 with railcar 521 at Eins Energie In Sachsen (Stadtwerke) (2008)By Henrik Boye.
July 3, 2008.
Führerstandsmitfahrt Straßenbahn Chemnitz (CVAG) - (Gablenz - Hutholz)Führerstandsmitfahrt Straßenbahn Chemnitz (CVAG) - (Gablenz - Hutholz)By Stoffuchs.
May 22, 2001.

Add a comment

Last updated: June 5, 2023.