Würzburg extra line 2: Hauptbahnhof - Zellerau
OperationalCity: Würzburg (Germany).
Route length: 4.4 km (2.7 miles).
Driving time: 14 min.
Track gauge: 1000 mm (metre gauge).
The line is operated by
Würzburger Versorgung und Verkehr (WVV)
Operational
Lines in Würzburg
Select line type: Tram lines, and extra lines.
Extra lines in Würzburg
Würzburg extra line 1: Sanderau, Köningsberger Straße - Grombühl / Uni-Kliniken
Operational
Würzburg extra line 2: Hauptbahnhof - Zellerau
Operational
Würzburg extra line 3: Hauptbahnhof - Heuchelhof
Operational
Stops
View the route map in high resolution.
Photos and videos of Würzburg extra line 2: Hauptbahnhof - Zellerau
Straßenbahn Würzburg Linie 5By esbek2.
February 14, 2016.
February 14, 2016.
Straßenbahn Würzburg linia 5By esbek2.
July 17, 2012.
July 17, 2012.
Tram Würzburg (1)By Klingl3r.
July 14, 2011.
July 14, 2011.
Würzburg extra line 2 with low-floor articulated tram 264 on Kaiserstraße (1998)By Henrik Boye.
July 25, 1998.
July 25, 1998.
Comments
Claus Kordowich (April 1, 2024):
"Wann fahren alle Straßenbahnen wieder?"