TRAM TRAVELS
2

Würzburg extra line 2: Hauptbahnhof - Zellerau

Operational

City: Würzburg (Germany).
Route length: 4.4 km (2.7 miles).
Driving time: 14 min.

Track gauge: 1000 mm (metre gauge).

The line is operated by

Würzburger Versorgung und Verkehr (WVV)
Operational

Lines in Würzburg

Select line type: Tram lines, and extra lines.


Extra lines in Würzburg

1Würzburg extra line 1: Sanderau, Köningsberger Straße - Grombühl / Uni-Kliniken
Operational

2Würzburg extra line 2: Hauptbahnhof - Zellerau
Operational

3Würzburg extra line 3: Hauptbahnhof - Heuchelhof
Operational

Stops

HauptbahnhofZellerau.

Würzburg extra line 2: Hauptbahnhof - Zellerau route map

View the route map in high resolution.

Photos and videos of Würzburg extra line 2: Hauptbahnhof - Zellerau

Straßenbahn Würzburg Linie 5Straßenbahn Würzburg Linie 5By esbek2.
February 14, 2016.
Straßenbahn Würzburg linia 5Straßenbahn Würzburg linia 5By esbek2.
July 17, 2012.
Tram Würzburg (1)Tram Würzburg (1)By Klingl3r.
July 14, 2011.
Würzburg extra line 2 with low-floor articulated tram 264 on Kaiserstraße (1998)Würzburg extra line 2 with low-floor articulated tram 264 on Kaiserstraße (1998)By Henrik Boye.
July 25, 1998.

Comments

Claus Kordowich (April 1, 2024):

"Wann fahren alle Straßenbahnen wieder?"

Add a comment

Last updated: October 2, 2024.