TRAM TRAVELS
T2

Saint-Étienne tram line T2: Cité du Desing - Châteaucreux

Operational

Before 2010: Saint-Étienne tram line 5.

City: Saint-Étienne (France).
Route length: 7.5 km (4.7 miles).
Driving time: 22 min.

Track gauge: 1000 mm (metre gauge).
Opened: August 30, 2010.

The line is operated by

Société des Transports de l'Agglomération Stéphanoise (STAS)
Operational

Tram lines in Saint-Étienne

T1Saint-Étienne tram line T1: Solaure - Hôpital Nord
Operational

T2Saint-Étienne tram line T2: Cité du Desing - Châteaucreux
Operational

T3Saint-Étienne tram line T3: Hôpital Nord - Bellevue
Operational

Stops

Cité du DesingChâteaucreux.

Add a comment

Last updated: September 2, 2023.