Poznań tram line 18: Ogrody - Franowo
OperationalCity: Poznań (Poland).
Route length: 11.2 km (7 miles).
Driving time: 36 min.
Track gauge: 1435 mm (standard gauge).
The line is operated by
Miejskie Przedsiębiorstwo Komunikacyjne w Poznaniu (MPK Poznań)
Operational
Lines in Poznań
Select line type: Tram lines, extra lines, night lines, special event lines, and tourist lines.
Tram lines in Poznań
Poznań tram line 1: Franowo - Junikowo
Operational
Poznań tram line 2: Dębiec - Ogrody
Operational
Poznań tram line 3
Operational
Poznań tram line 5: Górczyn - Stomil
Operational
Poznań tram line 6
Operational
Poznań tram line 7
Operational
Poznań tram line 9: Dębiec - Piątkowska
Operational
Poznań tram line 10: Dębiec - Połabska
Operational
Poznań tram line 11: Starołęka - Piątkowska
Operational
Poznań tram line 12: OS. Sobieskiego - Starołęka
Operational
Poznań tram line 13: Rondo Rataje - Junikowo
Operational
Poznań tram line 14: OS. Sobieskiego - Górczyn
Operational
Poznań tram line 15: Budziszyńska - OS. Sobieskiego
Operational
Poznań tram line 18: Ogrody - Franowo
Operational
Poznań tram line 4: Starołęka - Połabska
Closed
Poznań tram line 8: Miłostowo - Górczyn
Closed
Poznań tram line 16: OS. Sobieskiego - Franowo
Closed
Poznań tram line 17: Ogrody - Franowo
Closed
Poznań tram line 23
Closed
Poznań tram line 25
Closed
Poznań tram line 27: Dębiec - Zawady
Closed
Poznań tram line 28
Closed
Stops
Ogrody → Franowo → Rynek Jeżycki.
View the route map in high resolution.
Photos and videos of Poznań tram line 18: Ogrody - Franowo
August 23, 2015.
October 15, 2009.