TRAM TRAVELS
2

Ostrava tram line 2: Hlavní nádraží - Výškovice

Operational

City: Ostrava (Czech Republic).
Route length: 12.8 km (8 miles).
Driving time: 25 min.

Track gauge: 1435 mm (standard gauge).
Opened: May 1, 1901.

The line is operated by

Dopravní podnik Ostrava (DPO)
Operational

Lines in Ostrava

Select line type: Tram lines, extra lines, night lines, and special event lines.


Tram lines in Ostrava

1Ostrava tram line 1: Hlavní nádraží - Dubina
Operational

2Ostrava tram line 2: Hlavní nádraží - Výškovice
Operational

3Ostrava tram line 3: Dubina - Poruba Vozovna
Operational

4Ostrava tram line 4: Nová huť jižní brána - Martinov
Operational

5Ostrava tram line 5: Vřesinská - Zátiší
Operational

6Ostrava tram line 6
Operational

7Ostrava tram line 7: Výškovice - Vřesinská
Operational

8Ostrava tram line 8: Hlavní nádraží - Vřesinská
Operational

11Ostrava tram line 11: Hlučínská - Zábřeh
Operational

12Ostrava tram line 12
Operational

15Ostrava tram line 15
Operational

17Ostrava tram line 17: Dubina - Vřesinská
Operational

9Ostrava tram line 9: Vřesinská - Vozovna Křivá
Closed

13Ostrava tram line 13: Zábřeh - Hranečník
Closed

Ostrava tram line 2: Hlavní nádraží - Výškovice stops

Hlavní nádraží, and Výškovice.


Ostrava tram line 2: Hlavní nádraží - Výškovice route map

View the route map in high resolution.

Photos and videos of Ostrava tram line 2: Hlavní nádraží - Výškovice

Tramvaje Ostrava - Trams in OstravaTramvaje Ostrava - Trams in OstravaBy OstravaCzechRepublic.
April 3, 2011.

Add a comment

Last updated: March 3, 2024.