Mulhouse tram line 2: Coteaux - Nouveau Bassin
OperationalCity: Mulhouse (France).
Route length: 6.1 km (3.8 miles).
Driving time: 18 min.
Track gauge: 1435 mm (standard gauge).
Opened: May 13, 2006.
The line is operated by
Soléa
Operational
Lines in Mulhouse
Select line type: Tram lines, and regional lines.
Tram lines in Mulhouse
Mulhouse tram line 1: Gare Centrale - Châtaignier
Operational
Mulhouse tram line 2: Coteaux - Nouveau Bassin
Operational
Mulhouse tram line 3: Gare Centrale - Lutterbach Gare
Operational
Mulhouse tram line 1
Closed
Mulhouse tram line 2
Closed
Mulhouse tram line 3
Closed
Mulhouse tram line 4
Closed
Mulhouse tram line 5
Closed
Stops
Coteaux → Nouveau Bassin → Nations (Mulhouse) → Porte Jeune.
View the route map in high resolution.
Photos and videos of Mulhouse tram line 2: Coteaux - Nouveau Bassin
Mulhouse tram line Tram 2 with low-floor articulated tram 2015 at Porte Jeune (2007)By Henrik Boye.
July 5, 2007.
July 5, 2007.
Mulhouse tram line Tram 2 with low-floor articulated tram 2024 at Nations (Mulhouse) (2007)By Henrik Boye.
July 5, 2007.
July 5, 2007.