Mulhouse tram line 1: Gare Centrale - Châtaignier
OperationalCity: Mulhouse (France).
Route length: 5.7 km (3.5 miles).
Driving time: 18 min.
Track gauge: 1435 mm (standard gauge).
Opened: May 13, 2006.
The line is operated by
Soléa
Operational
Lines in Mulhouse
Select line type: Tram lines, and regional lines.
Tram lines in Mulhouse
Mulhouse tram line 1: Gare Centrale - Châtaignier
Operational
Mulhouse tram line 2: Coteaux - Nouveau Bassin
Operational
Mulhouse tram line 3: Gare Centrale - Lutterbach Gare
Operational
Mulhouse tram line 1
Closed
Mulhouse tram line 2
Closed
Mulhouse tram line 3
Closed
Mulhouse tram line 4
Closed
Mulhouse tram line 5
Closed
Stops
Gare Centrale → Châtaignier → Rattachement → Porte Jeune.
View the route map in high resolution.
Photos and videos of Mulhouse tram line 1: Gare Centrale - Châtaignier
Mulhouse tram line Tram 1 at Châtaignier (2019)By Ulrich Hackhe.
May 11, 2019.
May 11, 2019.
Mulhouse tram line Tram 1 on Porte Jeune (2019)By Ulrich Hackhe.
May 11, 2019.
May 11, 2019.
Mulhouse tram line Tram 1 with low-floor articulated tram 2001 at Rattachement (2019)By Ulrich Hackhe.
May 11, 2019.
May 11, 2019.
Mulhouse tram line Tram 1 with low-floor articulated tram 2009 on Porte Jeune (2019)By Ulrich Hackhe.
May 11, 2019.
May 11, 2019.
Le Tram de Mulhouse (Alsace)By Lokleitung.
January 4, 2011.
January 4, 2011.
Mulhouse tram line Tram 1 with low-floor articulated tram 2007 on Rue du 6'erme RTM (2007)By Henrik Boye.
July 5, 2007.
July 5, 2007.
Mulhouse tram line Tram 1 with low-floor articulated tram 2018 at Gare Centrale (2007)By Henrik Boye.
July 5, 2007.
July 5, 2007.
Postcard: Mulhouse tram line 1 near Katzenthal (2006)By Henrik Boye, R. Ansel.
2006.
2006.