Mannheim tram line 7
OperationalCity: Mannheim (Germany), Ludwigshafen (Germany).
Route length: 20.2 km (12.6 miles).
Driving time: 49 min.
Track gauge: 1000 mm (metre gauge).
The line is operated by
Rhein-Neckar-Verkehr in Ludwigshafen (RNV)
Operational
Rhein-Neckar-Verkehr in Mannheim (RNV)
Operational
Lines in Mannheim
Select line type: Tram lines, extra lines, extra regional lines, fast lines, regional lines, and restaurant lines.
Tram lines in Mannheim
Mannheim tram line 1: Schönau - Rheinau Bahnhof
Operational
Mannheim tram line 2: Feudenheim - Neckarstadt West
Operational
Mannheim tram line 3: Sandhofen - Rheingoldhalle
Operational
Mannheim tram line 6: Ebertpark - SAP Arena S-Bf
Operational
Mannheim tram line 6A
Operational
Mannheim tram line 7
Operational
Mannheim tram line 11
Closed
Mannheim tram line 12
Closed
Mannheim tram line 13
Closed
Mannheim tram line 16
Closed
Mannheim tram line 19
Closed
Mannheim tram line 21
Closed
Mannheim tram line 24
Closed
Mannheim tram line 25
Closed
Stops
Ebertpark → Paradeplatz → Vogelstang → Oppau → Ludwigsstr..
View the route map in high resolution.
Photos and videos of Mannheim tram line 7
July 12, 2014.
August 5, 2011.
October 14, 2009.