Lyon tram line T1: Debourg - IUT Feyssine
OperationalCity: Lyon (France).
Route length: 10.4 km (6.5 miles).
Driving time: 45 min.
Track gauge: 1435 mm (standard gauge).
Opened: January 2, 2001.
The line is operated by
Transports en Commun Lyonnais (TCL)
Operational
Lines in Lyon
Select line type: Tram lines, extra lines, night lines, and regional lines.
Tram lines in Lyon
Lyon tram line T1: Debourg - IUT Feyssine
Operational
Lyon tram line T2: Hôtel Région Montrochet - St Priest Bel Air
Operational
Lyon tram line T3: Gare Part-Dieu Villette - Meyzieu - Les Panettes
Operational
Lyon tram line T4: La Doua - Gaston Berger - Hôpital Feyzin Vénissieux
Operational
Lyon tram line T5
Operational
Lyon tram line T6
Operational
Lyon tram line 1
Closed
Lyon tram line 2
Closed
Lyon tram line 3
Closed
Lyon tram line 4
Closed
Lyon tram line 5
Closed
Lyon tram line 6
Closed
Lyon tram line 7
Closed
Lyon tram line 8
Closed
Lyon tram line 9
Closed
Lyon tram line 10
Closed
Lyon tram line 19
Closed
Lyon tram line 20
Closed
Lyon tram line 21
Closed
Lyon tram line 22
Closed
Lyon tram line 23
Closed
Lyon tram line 24
Closed
Lyon tram line 25
Closed
Lyon tram line 26
Closed
Lyon tram line 27
Closed
Stops
Debourg → IUT Feyssine → Montrochet → Guillotière Gabriel Péri → Part-Dieu - Auditorium → Perrache → Hôtel Région Montrochet.
![Lyon tram line T1: Debourg - IUT Feyssine route map](/map/m/lyon-tram-line-t1-debourg-iut-feyssine.webp)
View the route map in high resolution.
Photos and videos of Lyon tram line T1: Debourg - IUT Feyssine
![Lyon tram line T1 with low-floor articulated tram 24 at Part-Dieu - Auditorium (2018)](/foto/l/lyon-tram-line-t1-with-low-floor-articulated-tram-24-at-part-dieu-auditorium-2018.webp)
November 3, 2018.
![Lyon tram line T1 with low-floor articulated tram 29 at Guillotière Gabriel Péri (2018)](/foto/l/lyon-tram-line-t1-with-low-floor-articulated-tram-29-at-guillotiere-gabriel-peri-2018.webp)
November 3, 2018.
![Lyon tram line T1 with low-floor articulated tram 34 at Guillotière Gabriel Péri (2018)](/foto/l/lyon-tram-line-t1-with-low-floor-articulated-tram-34-at-guillotiere-gabriel-peri-2018.webp)
November 3, 2018.
![Lyon tram line T1 with low-floor articulated tram 46 at Part-Dieu - Auditorium (2018)](/foto/l/lyon-tram-line-t1-with-low-floor-articulated-tram-46-at-part-dieu-auditorium-2018.webp)
November 3, 2018.
![Lyon tram line T1 with low-floor articulated tram 48 in the intersection Rue Servient/Boulevard Marius Vivier Merle (2018)](/foto/l/lyon-tram-line-t1-with-low-floor-articulated-tram-48-in-the-intersection-rue-servient-boulevard-marius-vivier-merle-2018.webp)
November 3, 2018.
![Lyon tram line T1 with low-floor articulated tram 5 at Guillotière Gabriel Péri (2018)](/foto/l/lyon-tram-line-t1-with-low-floor-articulated-tram-5-at-guillotiere-gabriel-peri-2018.webp)
November 3, 2018.
![[Lyon] Citadis 302 - Aiguillage californien sur le tramway T1 à Gare Part-Dieu](/video/l/lyon-citadis-302-aiguillage-californien-sur-le-tramway-t1-a-gare-part-dieu.webp)
June 22, 2011.
![Lyon tram line T1 with low-floor articulated tram 13 at Montrochet (2007)](/foto/l/lyon-tram-line-t1-with-low-floor-articulated-tram-13-at-montrochet-2007.webp)
July 4, 2007.