Jena tram line 1: Lobeda-Ost - Zwätzen Schleife
OperationalCity: Jena (Germany).
Route length: 14.9 km (9.3 miles).
Driving time: 34 min.
Track gauge: 1000 mm (metre gauge).
Opened: April 6, 1901.
The line is operated by
Jenaer Nahverkehrsgesellschaft (JeNah)
Operational
Lines in Jena
Select line type: Tram lines, extra lines, and tourist lines.
Tram lines in Jena
Jena tram line 1: Lobeda-Ost - Zwätzen Schleife
Operational
Jena tram line 2: Jena-Ost - Winzerla
Operational
Jena tram line 3: Lobeda-Ost - Winzerla
Operational
Jena tram line 4: Zwätzen Schleife - Lobeda-West
Operational
Jena tram line 5: Ernst-Abbe-Platz - Lobeda-Ost
Operational
Jena tram line 34
Closed
Jena tram line 35
Closed
Stops
Zwätzen Schleife → Lobeda-West → Lobeda-Ost → Burgaupark → Nordschule → Stadtzentrum Löbdergraben.
View the route map in high resolution.
Photos and videos of Jena tram line 1: Lobeda-Ost - Zwätzen Schleife
Impressions of the Jena Tram (30.04.2015)By Hausgeist1977.
April 30, 2015.
April 30, 2015.
Jena tram line 1 with low-floor articulated tram 611 at Burgaupark (2014)By Henrik Boye.
July 14, 2014.
July 14, 2014.
Jena tram line 1 with low-floor articulated tram 616 at Nordschule (2014)By Henrik Boye.
July 14, 2014.
July 14, 2014.
Jena tram line 1 with low-floor articulated tram 615 at Zwätzen Schleife (2003)By Henrik Boye.
June 28, 2003.
June 28, 2003.
Jena tram line 1 with railcar 075 at Stadtzentrum Löbdergraben (1990)By Henrik Boye.
August 1990.
August 1990.
Postcard: Jena tram line 1 with railcar 139 on Dornburger Str. (1990)By Henrik Boye, Jenaer Nahverkehrsgesellschaft (JeNah), Krause.
1990.
1990.