Heidelberg Bergbahn
OperationalCity: Heidelberg (Germany).
Route length: 1.5 km (0.9 miles).
Driving time: 17 min.
Track gauge: 1000 mm (metre gauge).
Opened: 1890.
Closed: November 2, 2020 because of COVID-19.
Reopened: November 2, 2021.
The line is operated by
Rhein-Neckar-Verkehr in Heidelberg (RNV)
Operational
Lines in Heidelberg
Select line type: Tram lines, extra lines, extra regional lines, funiculars, and restaurant lines.
Funiculars in Heidelberg
Heidelberg Bergbahn
Operational
Stops
Kornmarkt → Königstuhl → Molkenkur → Schloss.
View the route map in high resolution.
Photos and videos of Heidelberg Bergbahn
Heidelberg Bergbahn with railcar Königstuhlbahn 3 at Molkenkur (2009)By Henrik Boye.
October 13, 2009.
October 13, 2009.
Heidelberg Bergbahn with railcar Königstuhlbahn 4 (2009)By Henrik Boye.
October 13, 2009.
October 13, 2009.
Heidelberg Bergbahn with railcar Molkenbahn 2 at Molkenkur (2009)By Henrik Boye.
October 13, 2009.
October 13, 2009.
Postcard: Heidelberg Bergbahn with railcar Molkenbahn 2 near Schloss (2004)By Henrik Boye, Verlag Johannes Oefner.
2004.
2004.
Heidelberg Bergbahn with railcar Königstuhlbahn 4 at Königstuhl (2001)By Henrik Boye.
February 2001.
February 2001.
Heidelberg Bergbahn with railcar Bergbahn 1 at Schloss (1998)By Henrik Boye.
April 9, 1998.
April 9, 1998.
Heidelberg Bergbahn with railcar Bergbahn 2 at Schloss (1998)By Henrik Boye.
April 9, 1998.
April 9, 1998.
Postcard: Heidelberg Bergbahn with railcar Bergbahn 2 near Schloss (1998)By Henrik Boye, Kunstverlag Gärtner-Schäfer.
1998.
1998.