TRAM TRAVELS
7

Hannover tram line 7: Wettbergen - Misburg

Operational

City: Hannover (Germany).
Route length: 17.6 km (10.9 miles).
Driving time: 39 min.

Track gauge: 1435 mm (standard gauge).
Opened: 1906.

The line is operated by

Üstra Hannoversche Verkehrsbetriebe
Operational

Lines in Hannover

Select line type: Tram lines, museum lines, night lines, regional lines, special event lines, and tourist lines.


Tram lines in Hannover

1Hannover tram line 1: Langenhagen - Sarstedt
Operational

2Hannover tram line 2: Alte Heide - Rethen Steinfeld
Operational

3Hannover tram line 3: Altwarmbüchen - Wettbergen
Operational

4Hannover tram line 4: Garbsen - Roderbruch
Operational

5Hannover tram line 5: Stöcken - Anderten
Operational

6Hannover tram line 6: Nordhafen - Messe / Ost (EXPO-Plaza)
Operational

7Hannover tram line 7: Wettbergen - Misburg
Operational

8Hannover tram line 8: Dragonerstr. - Messe / Nord
Operational

9Hannover tram line 9: Fasanenkrug - Hauptbahnhof
Operational

10Hannover tram line 10: Ahlem - Hauptbahnhof / ZOB
Operational

11Hannover tram line 11: Haltenhoffstr. - Zoo
Operational

13Hannover tram line 13: Fasanenkrug - Hemmingen
Operational

17Hannover tram line 17: Hauptbahnhof / ZOB - Wallensteinstr.
Operational

14Hannover tram line 14: Oberricklingen - Kleefeld
Closed

Hannover tram line 12
Closed

Hannover tram line 20
Closed

Hannover tram line 21
Closed

Stops

WettbergenMisburgParacelsuswegAllerwegKröpckeVier Grenzen.

Hannover tram line 7: Wettbergen - Misburg route map

View the route map in high resolution.

Photos and videos of Hannover tram line 7: Wettbergen - Misburg

Hannover tram line 7 with articulated tram 3013 at Allerweg (2022)Hannover tram line 7 with articulated tram 3013 at Allerweg (2022)By Henrik Boye.
July 24, 2022.
Hannover tram line 7 with articulated tram 3152 at Allerweg (2022)Hannover tram line 7 with articulated tram 3152 at Allerweg (2022)By Henrik Boye.
July 24, 2022.
Hannover tram line 7 with articulated tram 3012 at Hauptbahnhof (2018)Hannover tram line 7 with articulated tram 3012 at Hauptbahnhof (2018)By Henrik Boye.
June 3, 2018.
Hannover tram line 7 with articulated tram 3018 at Misburg (2016)Hannover tram line 7 with articulated tram 3018 at Misburg (2016)By Henrik Boye.
June 12, 2016.
Tram/City Rail Hannover 2015Tram/City Rail Hannover 2015By tramfreak2000.
April 4, 2015.
Hannover tram line 7 with articulated tram 2548 at Wallensteinstraße (2014)Hannover tram line 7 with articulated tram 2548 at Wallensteinstraße (2014)By Henrik Boye.
June 8, 2014.
Hannover tram line 7 with articulated tram 2548 on Wallensteinstraße (2014)Hannover tram line 7 with articulated tram 2548 on Wallensteinstraße (2014)By Henrik Boye.
June 8, 2014.
Hannover tram line 7 with articulated tram 2525 at Wettbergen (2012)Hannover tram line 7 with articulated tram 2525 at Wettbergen (2012)By Henrik Boye.
June 17, 2012.
[1/2] Tramwaje w Hanoverze - czyli studium przypadku - komunikacja idealna?[1/2] Tramwaje w Hanoverze - czyli studium przypadku - komunikacja idealna?By KolejTakPkpNie.
April 20, 2012.
Hannover tram line 7 with articulated tram 6235 at Paracelsusweg (2010)Hannover tram line 7 with articulated tram 6235 at Paracelsusweg (2010)By Henrik Boye.
June 12, 2010.
Stadtbahn Hannover - Vehicles (2007) (HD)Stadtbahn Hannover - Vehicles (2007) (HD)By Horst Honig.
2007.
Postcard: Hannover tram line 7 with railcar 404 at Oberricklingen (1971)Postcard: Hannover tram line 7 with railcar 404 at Oberricklingen (1971)By Dieter Höltge, Hannoversche Interessengemeinschaft für öffentlichen Personennahverkehr, Henrik Boye.
April 8, 1971.

Add a comment

Last updated: November 17, 2024.