Halle (Saale) regional line 5: Bad Dürrenberg, Markt - Berliner Brücke
OperationalCity: Halle (Saale) (Germany).
Route length: 31.2 km (19.4 miles).
Driving time: 105 min.
Track gauge: 1000 mm (metre gauge).
Opened: 1914.
The line is operated by
Hallesche Verkehr (HAVAG)
Operational
Lines in Halle (Saale)
Select line type: Tram lines, extra lines, extra regional lines, museum lines, night lines, and regional lines.
Regional lines in Halle (Saale)
Halle (Saale) regional line 5: Bad Dürrenberg, Markt - Berliner Brücke
Operational
Halle (Saale) regional line 5S
Closed
Halle (Saale) regional line 31
Closed
Halle (Saale) regional line 32
Closed
Stops
Berliner Brücke → Merseburg-Süd → Ammendorf → Bad Dürrenberg, Markt → Riebeckplatz.
View the route map in high resolution.
Photos and videos of Halle (Saale) regional line 5: Bad Dürrenberg, Markt - Berliner Brücke
Halle (Saale) regional line 5 with low-floor articulated tram 627 at Bad Dürrenberg, Markt (2023)By Henrik Boye.
July 19, 2023.
July 19, 2023.
Halle (Saale) regional line 5 with low-floor articulated tram 620 at Merseburg/Zentrum (2014)By Henrik Boye.
July 15, 2014.
July 15, 2014.
Tram Halle - Impressions June 25, 2010By 777whitestone.
June 25, 2010.
June 25, 2010.
Halle (Saale) regional line 5 with articulated tram 886 at Riebeckplatz (2001)By Henrik Boye.
July 31, 2001.
July 31, 2001.
Postcard: Halle (Saale) regional line 5 with railcar 724 at Merseburg / Zentrum (1981)By Der Bahnladen, Henrik Boye, Wolfgang Walper.
September 1981.
September 1981.