Graz tram line 5: Andritz - Puntigam
OperationalCity: Graz (Austria).
Route length: 10.4 km (6.5 miles).
Driving time: 33 min.
Track gauge: 1435 mm (standard gauge).
Opened: 1911.
The line is operated by
Holding Graz Linien
Operational
Lines in Graz
Select line type: Tram lines, christmas lines, extra lines, funiculars, museum lines, and special event lines.
Tram lines in Graz
Graz tram line 1: Mariatrost (Tramway Museum) - Eggenberg / UKH
Operational
Graz tram line 4: Reininghaus - Liebenau / Murpark
Operational
Graz tram line 5: Andritz - Puntigam
Operational
Graz tram line 6: Smart City / Peter-Tunner-Gasse / Tim - St. Peter
Operational
Graz tram line 7: Wetzelsdorf - LKH Med Uni / Klinikum Nord
Operational
Graz tram line 2: Hauptbahnhof (Europaplatz) - Wormgasse
Closed
Graz tram line 8
Closed
Stops
Andritz → Puntigam → Schlossbergplatz / Murinsel → Jakominiplatz.
View the route map in high resolution.
Photos and videos of Graz tram line 5: Andritz - Puntigam
December 21, 2014.
April 3, 2012.
August 26, 2011.
October 13, 2008.
1981.