Gotha tram line 2: Hauptbahnhof - Ostbahnhof
OperationalCity: Gotha (Germany).
Route length: 3.3 km (2.1 miles).
Driving time: 12 min.
Track gauge: 1000 mm (metre gauge).
Opened: 1902.
The line is operated by
Thüringerwaldbahn und Straßenbahn Gotha
Operational
Lines in Gotha
Select line type: Tram lines, extra lines, and regional lines.
Tram lines in Gotha
Gotha tram line 1: Hauptbahnhof - Kreiskrankenhaus
Operational
Gotha tram line 2: Hauptbahnhof - Ostbahnhof
Operational
Stops
Hauptbahnhof → Ostbahnhof → Huttenstr. → Hersdorfplatz → Bahnhofstr. → Orangerie.
View the route map in high resolution.
Photos and videos of Gotha tram line 2: Hauptbahnhof - Ostbahnhof
Tram in Gotha and the Thuringian Forest RailwayBy Spiegelwagen.
June 20, 2021.
June 20, 2021.
[Documentary] Thuringian Forest Railway and Gotha Tram - Part 1By Thüringerwaldbahn und Straßenbahn Gotha.
July 4, 2020.
July 4, 2020.
Sieben Minuten Wintergenuss auf der Thüringer WaldbahnBy Straßen Bahn.
February 6, 2018.
February 6, 2018.
Gotha tram line 2 with articulated tram 303 at Hersdorfplatz (2014)By Henrik Boye.
July 14, 2014.
July 14, 2014.
Gotha: Thüringerwaldbahn wird barrierefreierBy Mediengruppe Thüringen.
September 24, 2012.
September 24, 2012.
Trams in GothaBy choppernachladung.
July 9, 2012.
July 9, 2012.
Straßenbahn Gotha // Linie 6 im KT4D-ZRBy metr0p0Iitain.
July 7, 2012.
July 7, 2012.
Gotha regional line 4 Thüringerwaldbahn with articulated tram 395 at Hauptbahnhof (1998)By Henrik Boye.
July 24, 1998.
July 24, 1998.
Gotha tram line 1 at Hauptbahnhof (1998)By Henrik Boye.
July 24, 1998.
July 24, 1998.
Gotha tram line 2 with articulated tram 320 at Ostbahnhof (1998)By Henrik Boye.
July 24, 1998.
July 24, 1998.
Gotha tram line 2 with articulated tram 212 at Hauptbahnhof (1992)By Jens Christesen.
June 6, 1992.
June 6, 1992.
Gotha tram line 2 with railcar 36 at Huttenstraße (1990)By Henrik Boye.
August 1990.
August 1990.