Dijon tram line T2: Valmy - Chenôve Centre
OperationalCity: Dijon (France).
Route length: 12.4 km (7.7 miles).
Driving time: 34 min.
Track gauge: 1435 mm (standard gauge).
Opened: December 8, 2012.
The line is operated by
Divia
Operational
Lines in Dijon
Select line type: Tram lines, and regional lines.
Tram lines in Dijon
Dijon tram line T1: Dijon Gare - Quetigny Centre
Operational
Dijon tram line T2: Valmy - Chenôve Centre
Operational
Dijon tram line 1
Closed
Dijon tram line 2
Closed
Dijon tram line 3
Closed
Dijon tram line 4
Closed
Dijon tram line 5
Closed
Stops
View the route map in high resolution.
Photos and videos of Dijon tram line T2: Valmy - Chenôve Centre
Tram Dijon ligne 2 Chenove Centre ValmyBy alex spotter train.
June 23, 2019.
June 23, 2019.
Tramway de Dijon (2)By Funimag.
August 2, 2013.
August 2, 2013.
Tramway de Dijon (1)By Funimag.
July 30, 2013.
July 30, 2013.
Tramway de Dijon (3)By Funimag.
July 11, 2013.
July 11, 2013.
Tram Dijon Ligne 2By MlleCC21002.
May 7, 2013.
May 7, 2013.