TRAM TRAVELS
T1

Dijon tram line T1: Dijon Gare - Quetigny Centre

Operational

City: Dijon (France).
Route length: 8.7 km (5.4 miles).
Driving time: 28 min.

Track gauge: 1435 mm (standard gauge).
Opened: September 1, 2012.

The line is operated by

Divia
Operational

Lines in Dijon

Select line type: Tram lines, and regional lines.


Tram lines in Dijon

T1Dijon tram line T1: Dijon Gare - Quetigny Centre
Operational

T2Dijon tram line T2: Valmy - Chenôve Centre
Operational

Dijon tram line 1
Closed

Dijon tram line 2
Closed

Dijon tram line 3
Closed

Dijon tram line 4
Closed

Dijon tram line 5
Closed

Stops

Dijon GareQuetigny Centre.

Dijon tram line T1: Dijon Gare - Quetigny Centre route map

View the route map in high resolution.

Photos and videos of Dijon tram line T1: Dijon Gare - Quetigny Centre

Tram Dijon ligne 1 Gare Quetigny CentreTram Dijon ligne 1 Gare Quetigny CentreBy alex spotter train.
June 24, 2019.
Tramway de Dijon (2)Tramway de Dijon (2)By Funimag.
August 2, 2013.
Tramway de Dijon (1)Tramway de Dijon (1)By Funimag.
July 30, 2013.
Tramway de Dijon (3)Tramway de Dijon (3)By Funimag.
July 11, 2013.
Tramway de DijonTramway de DijonBy ErebosSan.
November 3, 2012.
Tramway de Dijon - Baptême du railTramway de Dijon - Baptême du railBy gazetteinfo.
February 16, 2012.

Add a comment

Last updated: September 23, 2024.