Detroit M-1 Rail: Grand Blvd - Congress St
OperationalCity: Detroit (United States).
Route length: 5.1 km (3.2 miles).
Track gauge: 1435 mm (standard gauge).
Opened: May 12, 2017.
Closed: March 29, 2020 because of COVID-19.
Reopened: September 27, 2021.
The line is operated by
QLine Detroit
Operational
Lines in Detroit
Select line type: Tram lines, and museum lines.
Tram lines in Detroit
Detroit M-1 Rail: Grand Blvd - Congress St
Operational
Stops
Grand Blvd → Congress St → Montcalm St → Ferry St.
View the route map in high resolution.
Photos and videos of Detroit M-1 Rail: Grand Blvd - Congress St
Detroit M-1 Rail with low-floor articulated tram 291 at Ferry St (2024)By Janus Boye.
June 18, 2024.
June 18, 2024.
Detroit M-1 Rail with low-floor articulated tram 289 close by Montcalm St (2024)By Janus Boye.
June 16, 2024.
June 16, 2024.
Detroit M-1 Rail with low-floor articulated tram 289 near Montcalm St (2024)By Janus Boye.
June 16, 2024.
June 16, 2024.