Darmstadt tram line 5: Böllenfalltor - Kranichstein
OperationalCity: Darmstadt (Germany).
Route length: 9.1 km (5.7 miles).
Track gauge: 1000 mm (metre gauge).
Opened: March 17, 2005.
The line is operated by
HEAG mobilo
Operational
Lines in Darmstadt
Select line type: Tram lines, extra lines, and fast lines.
Tram lines in Darmstadt
Darmstadt tram line 3: Hauptbahnhof - Lichtenbergschule
Operational
Darmstadt tram line 5: Böllenfalltor - Kranichstein
Operational
Darmstadt tram line 7: Arheilgen Dreieichweg - Eberstadt Frankenstein
Operational
Darmstadt tram line 8: Arheilgen Dreieichweg - Alsbach Am Hinkelstein
Operational
Darmstadt tram line 9: Böllenfalltor - Griesheim Platz Bar-le-Duc
Operational
Stops
Böllenfalltor → Kranichstein → Willy-Brandt-Platz → Luisenplatz.
View the route map in high resolution.