TRAM TRAVELS
3

Cologne tram line 3: Görlinger-Zentrum - Thielenbruch

Operational

City: Cologne (Germany).
Route length: 21.3 km (13.2 miles).
Driving time: 47 min.

Track gauge: 1435 mm (standard gauge).
Opened: 1904.
Closed: November 9, 1959.
Reopened: June 12, 1967.

The line is operated by

Kölner Verkehrs-Betriebe (KVB)
Operational

Lines in Cologne

Select line type: Tram lines, christmas lines, museum lines, and regional lines.


Tram lines in Cologne

1Cologne tram line 1: Weiden West - Bensberg
Operational

3Cologne tram line 3: Görlinger-Zentrum - Thielenbruch
Operational

4Cologne tram line 4
Operational

5Cologne tram line 5: Sparkasse Am Butzweilerhof - Heumarkt Köln
Operational

7Cologne tram line 7: Frechen-Benzelrath - Zündorf
Operational

9Cologne tram line 9: Sülz Hermeskeiler Platz - Königsforst
Operational

12Cologne tram line 12: Zollstock Südfriedhof - Merkenich
Operational

13Cologne tram line 13: Sülzgürtel - Holweide Vischeringstr.
Operational

15Cologne tram line 15
Operational

17Cologne tram line 17: Sürth Bf - Severinstr.
Operational

Cologne tram line 2
Closed

Cologne tram line 6
Closed

Cologne tram line 8
Closed

Cologne tram line 10
Closed

Cologne tram line 11
Closed

Cologne tram line 14
Closed

Cologne tram line 19
Closed

Cologne tram line 20
Closed

Stops

ThielenbruchGörlinger-ZentrumRochusplatzDeutz / Messe.

Cologne tram line 3: Görlinger-Zentrum - Thielenbruch route map

View the route map in high resolution.

Photos and videos of Cologne tram line 3: Görlinger-Zentrum - Thielenbruch

Cologne tram line 3 with articulated tram 2192 near Deutz / Messe (2002)Cologne tram line 3 with articulated tram 2192 near Deutz / Messe (2002)By Henrik Boye.
July 7, 2002.

Add a comment

Last updated: August 19, 2024.