TRAM TRAVELS
9

Brandenburg an der Havel tram line 9: Hauptbahnhof - Hohenstücken Nord

Closed

City: Brandenburg an der Havel (Germany).
Route length: 9.0 km (5.6 miles).

Track gauge: 1000 mm (metre gauge).

The line was operated by

Verkehrsbetriebe Brandenburg an der Havel (VBBr)
Operational

Lines in Brandenburg an der Havel

Select line type: Tram lines, christmas lines, and extra lines.


Tram lines in Brandenburg an der Havel

1Brandenburg an der Havel tram line 1: Hauptbahnhof - Anton-Saefkow-Allee
Operational

6Brandenburg an der Havel tram line 6: Hauptbahnhof - Hohenstücken Nord
Operational

9Brandenburg an der Havel tram line 9: Hauptbahnhof - Hohenstücken Nord
Closed

Brandenburg an der Havel tram line 3
Closed

Brandenburg an der Havel tram line 4
Closed

Brandenburg an der Havel tram line 5
Closed

Brandenburg an der Havel tram line 7
Closed

Brandenburg an der Havel tram line 8
Closed

Stops

HauptbahnhofHohenstücken Nord.

Brandenburg an der Havel tram line 9: Hauptbahnhof - Hohenstücken Nord route map

View the route map in high resolution.

Photos and videos of Brandenburg an der Havel tram line 9: Hauptbahnhof - Hohenstücken Nord

Tram in Brandenburg 1997Tram in Brandenburg 1997By Tramalbum.
1997.

Add a comment

Last updated: November 17, 2024.