Brandenburg an der Havel tram line 6: Hauptbahnhof - Hohenstücken Nord
OperationalCity: Brandenburg an der Havel (Germany).
Route length: 8.4 km (5.2 miles).
Driving time: 23 min.
Track gauge: 1000 mm (metre gauge).
Opened: February 1, 1955.
The line is operated by
Verkehrsbetriebe Brandenburg an der Havel (VBBr)
Operational
Lines in Brandenburg an der Havel
Select line type: Tram lines, christmas lines, and extra lines.
Tram lines in Brandenburg an der Havel
Brandenburg an der Havel tram line 1: Hauptbahnhof - Anton-Saefkow-Allee
Operational
Brandenburg an der Havel tram line 6: Hauptbahnhof - Hohenstücken Nord
Operational
Brandenburg an der Havel tram line 9: Hauptbahnhof - Hohenstücken Nord
Closed
Brandenburg an der Havel tram line 3
Closed
Brandenburg an der Havel tram line 4
Closed
Brandenburg an der Havel tram line 5
Closed
Stops
Hauptbahnhof → Hohenstücken Nord → Jacobstr. → Hauptstr. → Steinstr. → Neustädtischer Markt.
View the route map in high resolution.
Photos and videos of Brandenburg an der Havel tram line 6: Hauptbahnhof - Hohenstücken Nord
Brandenburg an der Havel tram line 6 with low-floor articulated tram 101 at Jacobstr. (2024)By Henrik Boye.
July 15, 2024.
July 23, 2019.
July 18, 2019.
July 10, 2011.
July 10, 2011.
July 31, 2001.