TRAM TRAVELS
305

Bochum tram line 305: Langendreer - Höntrop Kirche

Operational

Earlier: Bochum tram line 5.

City: Bochum (Germany).
Route length: 13.9 km (8.6 miles).

Track gauge: 1000 mm (metre gauge).
Closed: February 9, 1989.
Reopened: December 15, 2019.

The line is operated by

Bochum-Gelsenkirchener Straßenbahnen (BOGESTRA)
Operational

Lines in Bochum

Select line type: Tram lines, extra lines, and museum lines.


Tram lines in Bochum

107Bochum tram line 107
Operational

302Bochum tram line 302: Langendreer - Buer Rathaus
Operational

305Bochum tram line 305: Langendreer - Höntrop Kirche
Operational

306Bochum tram line 306: Hauptbahnhof - Wanne-Eickel Hbf
Operational

308Bochum tram line 308
Operational

310Bochum tram line 310: Höntrop Kirche - Heven Dorf
Operational

318Bochum tram line 318: Dahlhausen - Schürbankstr.
Operational

Bochum tram line 11
Closed

Bochum tram line 12
Closed

Bochum tram line 16
Closed

Bochum tram line 17
Closed

Bochum tram line 28
Closed

Bochum tram line 30
Closed

Bochum tram line 320
Closed

Stops

LangendreerHöntrop Kirche.

Bochum tram line 305: Langendreer - Höntrop Kirche route map

View the route map in high resolution.

Photos and videos of Bochum tram line 305: Langendreer - Höntrop Kirche

BOGESTRA - Mit Linie 305 durch die Bochumer InnenstadtBOGESTRA - Mit Linie 305 durch die Bochumer InnenstadtBy Manfred Kopka.
1989.

Add a comment

Last updated: March 8, 2024.