Augsburg tram line 64: Friedberg West P+R - Oberhausen Nord P+R
ClosedCity: Augsburg (Germany).
Route length: 11.4 km (7.1 miles).
Track gauge: 1000 mm (metre gauge).
Opened: 2012.
Closed: December 15, 2013.
The line was operated by
Augsburger Verkehrsgesellschaft (AVG)
Operational
Lines in Augsburg
Select line type: Tram lines, extra lines, museum lines, and special event lines.
Tram lines in Augsburg
Augsburg tram line 1: Lechhausen Neuer Ostfriedhof - Göggingen
Operational
Augsburg tram line 2: Haunstetten Nord - Augsburg West P+R
Operational
Augsburg tram line 3
Operational
Augsburg tram line 4: Oberhausen Nord P+R - Hauptbahnhof
Operational
Augsburg tram line 6: Friedberg West P+R - Hauptbahnhof
Operational
Augsburg tram line 5
Closed
Augsburg tram line 7
Closed
Augsburg tram line 13: Lechhausen Neuer Ostfriedhof - Haunstetten West P+R
Closed
Augsburg tram line 64: Friedberg West P+R - Oberhausen Nord P+R
Closed
Stops
Friedberg West P+R → Oberhausen Nord P+R.
View the route map in high resolution.
Photos and videos of Augsburg tram line 64: Friedberg West P+R - Oberhausen Nord P+R
April 2013.