Tranvía Cuatro Ríos de Cuenca
OperationalCity: Cuenca (Ecuador).
Total route length: 10.9 km (6.8 miles).
Track gauge: 1435 mm (standard gauge).
Opened: March 8, 2019.
Tram lines in operation
Cuenca tram line 1: Control Sur - Parque Industrial
Operational
Tranvía Cuatro Ríos de Cuenca stops
Control Sur, and Parque Industrial.
View the route map in high resolution. See the official route map.
Add a comment
Links
Tranvía
Language: Spanish.
See all links about trams in Cuenca.
Last updated: June 4, 2024.